AUSTRIA -- November 21, 2026 -- The tightest point on the detour around Austria's closed Arlberg railway is a seven-minute transfer at Sargans, and the line stays shut until 04:00 on 23 November 2026.
Austrian Federal Railways (ÖBB) closed the Ötztal–Bludenz section at 09:15 on 18 November for engineering work. That is 114 hours and 45 minutes, spanning six calendar dates and five nights. Some ÖBB online notices give 22 November as the end date. ÖBB's engineering poster fixes the end at 04:00 on Monday 23 November. Swiss operator SBB describes the wider affected corridor as Buchs SG–Ötztal.
Night trains between Zurich, Vienna and Budapest now run through Germany
SBB lists the Zurich–Vienna Nightjet (NJ 466/467) and the Zurich–Budapest EuroNight (EN 40462/40467) as affected. Both divert through Germany. They skip Bludenz, Langen am Arlberg, St Anton am Arlberg, Landeck-Zams and Innsbruck, and add a stop at Bregenz. A ticket to any skipped station needs a revised route. A diverted berth is not a cancellation.
Hungarian operator MÁV's notice shows one diverted pair. The Budapest departure at 20:30 reaches Zurich at 10:19 the next morning, a journey of 13 hours 49 minutes by our calculation. The Zurich departure at 19:39 calls at Bregenz at 23:00.
The dates differ by direction. Budapest-to-Zurich departures are affected on the nights of 18/19 to 21/22 November. Zurich-to-Budapest workings run through 22/23 November, so a train leaving on Sunday 22 November can still be affected on Monday morning.
Daytime passengers switch to replacement buses with thin margins at Sargans
MÁV's replacement timetable chains a Budapest–Ötztal Railjet, an Ötztal–Sargans coach and a Swiss IC3 train. The coach alone takes 2 hours 28 minutes, or 148 minutes. Published alternatives include transfers of seven or eight minutes at Sargans. A bus running seven minutes late would use up the whole buffer on the tightest one. This is a timetable reading, not a record of missed connections.
ÖBB's replacement services:
- Railjet Xpress, EuroCity and Westbahn: direct and stopping buses between Innsbruck or Ötztal and Bludenz or Sargans, as appropriate
- Local REX1 and S4 trains: buses between Ötztal and Landeck-Zams
- Imsterberg: a minibus transfer
ÖBB Postbus warns that onboard ticket sales and bicycle carriage are limited. ÖBB asks for 24 hours' notice for international mobility assistance. Hotels should match pick-ups to the train that actually runs, not keep an Innsbruck collection for a sleeper that skips the city. Operators have published no figures for affected passengers or hotel cancellations.
Your refund options depend on how you booked the ticket
SBB separates international tickets issued in one transaction from independently bought legs, which may count as separate transport contracts. Its Agreement on Journey Continuation may allow a later eligible train, but it does not automatically cover a new reserved berth, a hotel or a taxi.
European Commission rail passenger-rights guidance offers rerouting or a refund to qualifying through-ticket passengers who expect to arrive 60 minutes or more late after a missed connection. If such passengers get no rerouting information within 100 minutes, they may arrange reasonable rail, coach or bus travel and claim eligible expenses. A planned diversion does not guarantee compensation. A Commission proposal for stronger multi-operator ticket protection, made in May 2026, was not yet law on 15 November.
Other works in Hungary and Switzerland are separate from the Arlberg closure
MÁV lists 16–20 November works on Budapest–Győr–Hegyeshalom, including cancellation of the 14:32 Győr–Hegyeshalom local train. MÁV says trains missing from its amended Arlberg table keep their existing schedules.
SBB separately lists modified Zurich–Salzburg journeys from 15 October to 12 December 2026, with some journeys up to one hour longer.